ESCO Contract types and Service procedures Yamatake ESCO Service

Contract types

ESCO service contract concluded between a customer and Yamatake is roughly divided into two types according to the way of fund raising.
The first type is the Guaranteed-Savings Contract where customers raise fund for initial investment by themselves, and the second type is the Shared-Savings Contract where Yamatake shoulders the initial cost. In both types of contracts, Yamatake guarantee the amount of energy cost reduction, from which facility investment can be recovered. See diagrams below indicating the flow of fund by contract types.

Contract type Guaranteed-Savings Contract Shared-Savings Contract
Item
Way of
fund raising
Cost / merit
analysis
Page Top

ESCO Service Procedures

Yamatake will meet any of your needs with its outstanding expertise as a professional for building facilities by offering comprehensive services including consultation to installation of facilities to advices for system operation.

Preliminary diagnosis A preliminary diagnosis is carried out based on the analysis of the existing condition of energy usage, energy management, etc.

 
Proposal Based on the diagnosis, optimum energy conservation measures for the customer are proposed. Detailed plans include, for example, the best combination of facilities to be used, the cost for facility replacement, and expected advantages for the customer.

 
Confirmation of
proposed plan
The customer examines and chooses options in our proposal including baseline setting, facility installation plan, measurement and verification methods, estimation of expected energy conservation effect, fund raising method, guarantee of energy conservation effect, technical supports such as operational management, contract type, and the contents of the contract according to the needs of the customer.

 
Conclusion of contract  

 
Facility installation, Engineering The plan is brought into effect. Based on the plan, design and installation of the system are carried out. Along with that, instructions on operation and management of the system are offered.
 
 
Performance checks,
technical supports
The checks and supports are continued to the end of ESCO service period. To measure and assess the effect of energy conservation and check if any changes of the plan are necessary, the data are periodically collected and analyzed, and the result is verified. To maximize the energy conservation effect, we cooperate with the customer for optimal system operation.

 
Checks by customer  

 
Further improvement We are ready to take a swift action, when anything to be improved in operation, settings, and facilities are discovered. To offer the best energy conservation strategy at anytime by keeping up with the ever-changing building condition, we will always watch your building with due care.