[Client type / Hotels]
Customer’s remarkWe think that energy conservation measures do not end with introduction of new facilities. We believe that the effects of energy saving can not be fully achieved without optimization of operation and management. In this case, to fulfill the standard of the COP3 for emission reduction, the contractor, the administrator, and the ESCO service provider must hold a follow-up meeting every month to have a lively discussion. Sales points
Energy conservation effect![]() Comparison between before and after the facility installation
|
Key points in installation work As the installation work was carried out without
closing the hotel, utmost attention was paid to minimize
the noises and vibrations.
Inverter
BEMS system |
||||||||||||||||||||||||||||||||||||||||
Facility specifications
| Contract demand | 1,150kW | Air-conditioning facilities | vapor absorption refrigerator, gas smoke tube boiler, water-cooled chilling unit |
| Stories | 17 stories and basement | ||
| Total floor area | 29,800m2 | Refrigerating capacity | 350RT x 2, 100RT x 1 |
| Receiving voltage | 6.6kV | Heating capacity | 3,881Mcal/h x 2 |
| Type of air-conditioning | Fresh-air filtration system, air-conditioner, fan coil unit, hydrothermal heat pump package, water-cooled package, air-cooled heat pump air-conditioner | ||
Energy conservation measures
| Variable airflow control using fresh-air filtration system and total enthalpy heat exchanger: | Inverter controlled suction and exhaust fans are used for fresh-air filtration system and total enthalpy heat exchanger to change settings according to estimated conditions in the use of rooms by time zones in a day. |
| Variable airflow control of air-conditioner, control of CO2 concentration: | An air-conditioning system featuring variable airflow control with thermal sensor is adopted, but to keep necessary amount of fresh air intake, CO2 concentration in ventilated air is detected and when CO2 concentration exceeds a predetermined level, the ventilating fan is revved up. |
| Variable flow control of heat pump | Quantity of the heat source flowing in a heat pump that is normally kept constant is made adjustable according to load factors. |
| Introduction of BEMS | Based on collected data, operation and management can be optimized. |
| Better use of cogeneration system | Management of the existing gas cogeneration system is brought under BEMS system to realize further efficiency. |
Fund raising and subsidies
| Fund | : | self-financing |
| Subsidies | : | Project for Promoting the Introduction of High-Efficiency Housing/Building Energy Systems (Project for promoting BEMS introduction) |
Contract type and contract period