[Client type / Industrial plants]
Customer’s remarkThe service is valuable as it handles the planning of all the facilities as a whole, not individual facilities one by one. A comprehensive energy conservation measures covering the entire building are practicable. It is also appreciated that it does not require the initial lump-sum investment to procure the facility. Sales points
Energy conservation effect![]() Comparison between before and after the facility installation
|
Key points in installation work Discussion with the ESCO service provider was made to keep the cost for verification of energy conservation effect as low as possible and the deal was closed.
CO2 control system
Cabinet panel (integrated time meter)
Demand controller (I/O control unit) |
||||||||||||||||||||||||||||||||||||||||
Facility specifications
| Contract demand | 593kW | Air-conditioning facilities | packaged air conditioner, boiler, cooling tower |
| Stories | 1 story x 4 buildings | Refrigerating capacity | equivalent to 100RT |
| Total floor area | 5,045m2 | Heating capacity | 1,500MJ/h |
| Receiving voltage | 6.6kV | Type of air-conditioning | packaged air conditioner |
Energy conservation measures
| Introduction of high-efficiency lighting | Mercury lamps were replaced with sodium lamps. |
| Replacement of fluorescent light ballasts | Fluorescent light ballasts were replaced with inverter-controlled ones (Type 422). |
| Introduction of demand controller | Demand control of PAC air conditioner was employed. |
| Introduction of CO2 based control of air conditioner | Intake amount of fresh air is automatically controlled according to the CO2 concentration in the room air. |
Fund raising and subsidies
| Fund | : | Paid by the ESCO service provider |
Contract type and contract period